These forums have been archived and are now read-only.

The new forums are live and can be found at https://forums.eveonline.com/

Player Features and Ideas Discussion

 
  • Topic is locked indefinitely.
 

Industry Panel: Get missing required materials for X runs

Author
Aero089
Exiled.
#1 - 2014-12-11 18:15:08 UTC
Hey guys,

I'm pretty sure this has been suggested before, but there's so many ways to describe this that a search brings up nothing relevant, so I'll post it up just to be sure.

I've gotten into manufacturing over the past few months and with all EVE changes so far, I'm relieved to see it's not nearly the 'Spreadsheet Online' that it used to be. The need for spreadsheets is nearly gone.

Nearly.

I'd like to see an option in the industry panel to freely set the quantity of runs, rather than the maximum runs on the BPC that it allows now. That way, you can stock up on the materials needed.

I think it's fairly self-explanatory and I'm guessing that it can easily be created as a feature.


Thanks,

Aero089
Iain Cariaba
#2 - 2014-12-11 18:29:12 UTC
Aero089
Exiled.
#3 - 2014-12-11 18:34:40 UTC  |  Edited by: Aero089
Iain Cariaba wrote:

Thanks for the heads up, but it's not what I want.

I want the ingame panel to show me the requirements for 25 Vagabonds, minus what I already have, that I can just rightclick-enter and instantly purchase all materials for.

Really needs to be a UI thing, and all CCP needs to do is disable the limiter on the amount of runs in the industry panel. WEll, preferrably make in a option, so a bit of polish is in order ;)


=====

The current workaround is to open the blueprint information panel (say, Valkyrie II Blueprint) and drag the icon back on to the industry tab. It will treat it like a BPO with unlimited runs, but it will forget the ME/TE values. Still, it is something!