Material cost not adding up?

Author
Xyries
Garoun Investment Bank
Gallente Federation
#1 - 2013-04-15 00:39:16 UTC  |  Edited by: Xyries
So I'm trying to manufacture from a blueprint. I currently have PE IV, so not perfect but just trying to figure things out. When I go to submit a job, however, the cost from the blueprint (YOU) and the cost that I'm told I have to pay does not match. Anyone know what is going on?

http://i.imgur.com/iWAkLq5.png
Tau Cabalander
Retirement Retreat
Working Stiffs
#2 - 2013-04-15 00:53:22 UTC  |  Edited by: Tau Cabalander
I bug reported this 4 months ago: bug 150569

https://forums.eveonline.com/default.aspx?g=posts&m=2382356#post2382356

I suggest you bug report it as well.
Xyries
Garoun Investment Bank
Gallente Federation
#3 - 2013-04-15 01:05:53 UTC
Haha guess I'll have to wait until I get PE 5 then :-P

Thank for the reply, and bug reported.
Reaver Glitterstim
The Scope
Gallente Federation
#4 - 2013-04-30 04:05:08 UTC
I saw this when I did industry also. It was confusing but did not appear to be a bug. It seemed to want me to give it more minerals than the job required (listed in the extra field) and I don't know why, but I assume I got the minerals back when I was done. I didn't actually check though.

FT Diomedes: "Reaver, sometimes I wonder what you are thinking when you sit down to post."

Frostys Virpio: "We have to give it to him that he does put more effort than the vast majority in his idea but damn does it sometime come out of nowhere."

DeLindsay
Galaxies Fall
#5 - 2013-04-30 04:18:49 UTC
Are you taking into account the waste of the facility used? It even states right on the Blueprint

"Bill of Materials does not take into consideration the efficiency of the installation"

However, I have found that with perfect build skills like I have that there doesn't seem to be any discrepancy from the stated required amounts. If there has been it's been minuscule. But I have on multiple occasions taken the exact required materials to the NPC station I happened to build in that day and it built the item fine.

The Operative: "There are a lot of innocent people being killed in the air right now".

Capt. Malcolm Reynolds: "You have no idea how true that is".

RubyPorto
RubysRhymes
#6 - 2013-04-30 19:09:58 UTC
DeLindsay wrote:
Are you taking into account the waste of the facility used? It even states right on the Blueprint

"Bill of Materials does not take into consideration the efficiency of the installation"

However, I have found that with perfect build skills like I have that there doesn't seem to be any discrepancy from the stated required amounts. If there has been it's been minuscule. But I have on multiple occasions taken the exact required materials to the NPC station I happened to build in that day and it built the item fine.


The only installations that I know of that have material multipliers that aren't 1 (i.e. efficiencies other than 100%) are:
Rapid Equipment Assembly Array
the Advanced Ship Assembly Arrays

"It's easy to speak for the silent majority. They rarely object to what you put into their mouths." -Abrazzar "the risk of having your day ruined by other people is the cornerstone with which EVE was built" -CCP Solomon

Haulie Berry
#7 - 2013-04-30 19:26:39 UTC  |  Edited by: Haulie Berry
If I had to guess, I would say skill-based wasteage is being applied to the extra materials, and the waste amount is being added to the raw material total.

If I had to guess. No idea if that's what's supposed to happen. It certainly is an awkward interface.

e.g., pyerite - You: 446077
Extra: 208811

208811 * .05 + "You" = 456517.55

On the other hand, I could swear I recall extra mats not being affected by any modifier, so there's that... but the numbers do add up.